ConstructINS
Sign in

Portfolio · ConstructINS

Upload center

Bring a project in from its own files — tender and contract, program, budget, workforce, site progress, quality and handover — for a new project or one already on site.

What changed in Upload center recently

  1. New · Release 2.13 · 10 November 2026

    A working calendar set on a sample project now moves its figures: the work left is laid out over its working days — rest days, Egypt’s public holidays, Ramadan output and any shutdown — so the forecast finish, the slip, the master plan’s dates, site overheads, delay damages and the decision to win the days back all follow. Preview it with the finish before and after, from the sample’s panel in the Upload center.

  2. New · Release 1.96 · 31 October 2026

    A technical sheet at /spec, ready to print: every connection and how it works, the files the Upload center reads, sign-in (Microsoft Entra single sign-on and passkeys), hosting, records, export and the AI’s data handling.

  3. New · Release 1.94 · 30 October 2026

    Both registers are on Materials & Suppliers, in Quality & Safety and Procurement, in the Upload center with Excel templates and samples, in Ask (where a lot came from, what expires soon) and in a new Materials traceability & store report.

  4. New · Release 1.68 · 27 October 2026

    A large synthetic demonstration project — six towers, a retail podium and infrastructure, about 18,000 records — loads in one click from the Upload center, or downloads as the files a client would upload.

  5. New · Release 1.63 · 24 October 2026

    Sample project in the Upload center: Yasmeen Heights Residences, Tower 2 — two basements, ground and ten floors in New Cairo, a 30-month job about sixteen months in — as the files a contractor and its developer keep: priced BOQ, contract terms, Primavera-style program, cost plan, purchase orders, a 247-person site roster with subcontractor gangs, daily site reports with quantities, inspections, cube tests and NCRs, variations, notices and claims, interim payments net of retention, advance recovery, withholding and VAT, handover documents, risk register, HSE register, the developer’s budget and unit sales, a company tender history and a weekly update workbook. Load it in one click to see every screen fill in, or download the files (one by one or as a .zip) and upload them yourself. Dates move with the day you download, so it always reads as a live job.

  6. New · Release 1.63 · 24 October 2026

    Messages & letters (Contracts, Commercial, Procurement, Quality & Safety, Handover, Decisions and the Upload center): the week’s correspondence drafted from the project data — notices of delay inside their time bar, overdue certificates with their figures and the contract remedies, requests to decide pending variations and claims, supplier chases naming the activity a late delivery holds, NCR actions to the person responsible, blocking handover items, and the weekly progress report. Each in English and Arabic as a letter, an email and a WhatsApp message; edit, then copy, open in email, open a WhatsApp chat (with the roster’s number when it has one) or download the letter as a Word document. Nothing is sent from the platform.

Every release