ConstructINS
Sign in

Portfolio · ConstructINS

Delivery Lifecycle

Award to defects liability, with the gate that has to clear at every step and what it holds up.

What changed in Delivery Lifecycle recently

  1. Fixed · Release 2.06 · 8 November 2026

    On Arabic screens, a label that means two things in English now shows the right Arabic in each place: the State column of the Delivery Lifecycle gates reads as a status, not as a country; Open on a report reads as an action, while the count of open decisions stays a status; a gate’s Share of the cash held reads as a portion, not as sharing a report; the Owner of a risk or a decision reads as the person responsible, while the account owner in Team activity stays the owner; and Raised reads as a date on NCRs and alerts, and as a count on the handover snags.

Every release